Schaerbeek, near the Chasseurs Ardennais and the European Economic Community (EEC), is a highly sought-after neighborhood. In a splendid Brussels-style building, on the 3rd and last floor, in a duplex layout, the apartment is arranged as follows: entrance hall with a cloakroom area, resting landing, large equipped kitchen with access to a beautiful, sunny, and unobstructed terrace, a living room, and a dining area, storage nook, or office space. Upstairs, there is a spacious bedroom with integrated closets and a bathroom with a bathtub and sink. The apartment features a new gas condensation boiler, PEB E+ rating, individual meters for water, gas, and electricity, a laundry corner in the basement, and a communal cellar. Available from March 15th. Visits by appointment at 02/732 52 68 or info@kvolution.be. Rent is 1050 euros + 50 euros for common charges.
Avenue Milcamps 127 - 1030 Schaerbeek
| Referentie | 5841243 |
|---|---|
| Categorie | Duplex |
| Gemeubeld | Nee |
| Aantal kamers | 1 |
| Aantal badkamers | 1 |
| Terras | Ja |
| Bewoonbare oppervlakte | 80 m² |
| Beschikbaarheid | 15-03-2024 |
| Verdieping | 3 |
|---|---|
| Verdiepingen - aantal | 3 |
| Keuken | Ja |
|---|---|
| Type verwarming (type (ind/coll)) | individueel |
| Lift | Nee |
| Type verwarming | condensatie |
| Keuken - type | VS volledig geïnstalleerd |
| Badkamer (type) | ligbad |
| Type dubbele beglazing | thermische en akoestische onderbreking |
| Datum laatste ketelonderhoud | 02-01-2024 |
| Toiletten - aantal | 1 |
|---|---|
| Slaapkamer 1 (oppervlakte) | 16 m² |
| Terras - aantal | 1 |
| Woonkamer (oppervlakte) | 25 m² |
| Keuken (oppervlakte) | 18 m² |
| Terras 1 - oriëntatie | oost |
| Surface balkon 1 (oppervlakte) | 18 m² |
| Lasten huurder (bedrag) | 50 € |
|---|---|
| Huurgarantie - aantal maanden | 2 |
| Type buurt | Vrij zicht |
|---|---|
| Type buurt 2 | Vrij zicht |
| Oriëntatie van de voorgevel | west |
| Terras 1 (oppervlakte) | 16 m² |
|---|
| EPC-klasse | E |
|---|---|
| EPC (Kwh/m²/j) | 229 |
| CO2 uitstoot | 45 |
| EPC valid until (datetime) | 19-12-2027 |
| EPC datum (datetime) | 26-06-2017 |